Electrical

New three-phase supply for a house in Las Rozas

A new three-phase supply line from the meter to the house and a rebuilt fuse box with a 63 A main switch, with its electrical certificate.

Las Rozas · April 2024

We ran a 16 mm² three-phase line from the meter to the house, rebuilt the fuse box with a 63 A main switch and a phase distributor, and handled the electrical installation certificate.

Photos of the job

Services in this job

Area

Shall we send you a quote?

Tell us what you need in four short steps. We reply with a clear quote.

Request a quote
Request a quote